How to wire inside the Electrical Distribution Board?

Publish Time: Author: Site Editor Visit: 311

When the working conditions and site preparation of the Electrical Distribution Board have been completed. The installation of the box is over. There is nothing in the cabinet, and the wiring and tape are fully prepared, which meets the installation requirements of design drawings and equipment. In this issue of news and information, the small editor will introduce the method of internal wiring for the Electrical Distribution Board. Let's have a look.

 

1、 Installation of track in the box.

 

The installation of the guide rail of the Electrical Distribution Board shall be horizontal and consistent with the open operation hole of the cover plate. Photos of guide rail installation.

 

2、 The box is empty for installation.

 

1. When installing the empty box, first pay attention to the position of the empty box installation hole of the box cover to ensure that the empty box position is in the reserved position of the box cover. Secondly, when installing the switch, please arrange it from left to right. The reserved position required for the switch is the entire position.

 

2. The reserved position is generally placed on the right side of the Electrical Distribution Board. A complete overall position is reserved between the general empty box in the first row and the empty port of the connection of the first empty box.

 

3、 Open the zero line wiring.

 

1. The color of the zero line of the Electrical Distribution Board shall be blue.

 

2. Lighting and socket circuits generally adopt 2.5mm2 conductors, and the open space connected by each conductor of the Electrical Distribution Board shall not exceed 3. Air conditioning circuit generally adopts 2.5mm2 or 4.0mm2 conductor, leaving one conductor empty.

 

3. Zero lines between different cannot be shared. If the first yellow wire matched with a connects two 16A lighting ports, the open circuit zero line matched with a can only match these two ports, and then directly connect with the zero line terminal.

 

4. The wiring between the main port and each port in the cabinet generally goes to the left, and the wiring of the Electrical Distribution Board generally goes to the right.

 

5. The wiring in the cabinet shall be straight without texture. Wires shall be tied with plastic straps of appropriate size and evenly spaced.

 

6. The bending of the conductor shall be consistent and there shall be no dead bending to prevent damage to the conductor insulation and internal copper core.

 

7. After binding, cut off the unused parts with pliers.

 

The above is only the internal wiring diagram of the Electrical Distribution Board, and the wiring requirements are based on this, but other specific requirements such as the specification and quantity of switches in it are based on the drawings.

Next How to use the lighting Pole Top Box?
Greaseproof Paper Bags Meter Seals Meter Seal Wireless Earbuds Sanitary Valve Hygienic 3 PCS Ball Valve Aerial Cable Powerfitting Paper Bag Machine Paper Bag Machine Ball Valve Security Seal Braided Copper Wires and Braided Copper Connectors BALL VALVE Sanitary Pump Optical Frame Sanitary Valves 卫生泵 卫生泵 Anti Corrosion Pipe Supports Paper Straw Making Machine