What is the difference between meter box and ready board box?

Publish Time: Author: Site Editor Visit: 281

The electricity meter box and ready board box are collectively referred to as "three boxes". 1. Lighting box 2. Power box 3. Metering box The electricity meter installed in the electricity meter box belongs to the "metering box", which has anti-theft devices according to different requirements; "ready board box" is the general term of "lighting ready board box" and "power ready board box" for power distribution! There are mainly "power generation", "power transmission", "power transformation" and "power distribution". In normal conditions, power generation is the first step. After the step-up transformer is changed to high voltage, it is transmitted to various places. After the voltage transformer is gradually changed to the voltage we need, it is finally transmitted to the electrical equipment through the distribution equipment.

 

Next What is the collector in the meter box?
Greaseproof Paper Bags Meter Seals Meter Seal Wireless Earbuds Sanitary Valve Hygienic 3 PCS Ball Valve Aerial Cable Powerfitting Paper Bag Machine Paper Bag Machine Ball Valve Security Seal Braided Copper Wires and Braided Copper Connectors BALL VALVE Sanitary Pump Optical Frame Sanitary Valves 卫生泵 卫生泵 Anti Corrosion Pipe Supports Paper Straw Making Machine