Blog

Experimental requirements for small power distribution unit (SPDU)

Publish Time: Author: Site Editor Visit: 264

The requirements for small power distribution unit (SPDU) experiments include the following aspects:

First of all, to ensure the safety of the experimental site, the small power distribution unit (SPDU) should be located in a well-ventilated, waterproof and moisture-proof environment, away from flammable items.

Secondly, before the experiment, the integrity of the small power distribution unit (SPDU) and related equipment needs to be checked to ensure that the cable connections are firm and there are no safety hazards such as damage or leakage.

During the experiment, the requirements of the experiment instructions must be followed to ensure accurate readings of the meter. Be careful not to overload the meter to prevent damage to the equipment

During the experiment, attention should be paid to electrical safety, ensuring correct wiring to avoid short circuit and electric shock accidents. It is prohibited to change the meter parameters without authorization to avoid affecting the experimental results.

Finally, after the experiment, carefully check the equipment, turn off the power, and restore the experimental site to cleanliness to ensure safety and effectiveness for the next use.

Next What are the benefits of using a small power distribution unit?